top of page


Project: Thomas J. Hatem Memorial Bridge - US 40 Over Susquehanna RiverGrid Manufacturer: LB Foster
Location: Havre De Grace, MD Contractor: Joseph B. Fay Company
Install Date: 2008 - 2010Design Engineering Company: Wallace, Montgomery, & Associates, LLP
Bridge Owner: Maryland Transportation Authority (MdTA)
Project Description: Over 380,000 SF of partial-depth concrete filled steel grid deck, which will be replaced in three stages.
Notable Features of Project: Oldest of the seven toll facilities operated and maintained by the MdTA . Original grid deck was in service for 70 years prior to replacement, with an annual traffic volume of approximately 11 million vehicles.
Chat
bottom of page