top of page
Project: Senator George Sellar Bridge (SR 285) over the Columbia River. Grid Manufacturer: Bailey Bridge
Location: Wenatchee, WA. Contractor: Max J. Kuney
Install Date: 2011 Design Engineering Company: WSDOT
Bridge Owner: Washington State Department of Transportation
Project Description: Over 10,000 square feet of cast-in-place Exodermic® deck was installed on the new bicycle & pedestrian lane added to the South side of the bridge.
Notable Features of Project: Using the lightweight Exodermic® deck on the new bicycle & pedestrian lane allowed WSDOT to add a 5th lane in place of the original sidewalk, without strengthening the tied-arch structure.
bottom of page