Project: Cornelia Munoz BridgeGrid Manufacturer: LB Foster

Location: Bruzual, VenezuelaContractor: Taller Chama C. A

Install Date: 2004Design Engineering Company: Fundacion Fondo Nacional de Tranporte Urbano (Fontur)

Bridge Owner: Fundacion Fondo Nacional de Tranporte Urbano (Fontur)

 

Project Description: 24,000 sf of 5" -4 way Open Grid installed during short term temporary full bridge closures. Work lasted about 5 months total. Material was purchased directly by Fontur and was installed by Taller Chama.

Notable Features of Project: Steel suspension bridge is 300 meters long, 7.30 meters wide.