top of page

Project: Arrigoni Bridge (Route 66 & 17) over Route 9 & Connecticut River. Contractor: Middlesex Corporation 

Location: Middletown & Portland, CT  Design Engineering Company: STV, Inc.

Install Date: 2012  Bridge Owner: Connecticut Department of Transportation

 

Project Description: Approximately 55,000 square feet of cast-in-place full depth grid reinforced concrete deck panels.

Notable Features of Project: Half-width closures (3 stages) with two of the four lanes open to traffic throughout the duration of the project.

Chat
bottom of page