top of page
Project: Arrigoni Bridge (Route 66 & 17) over Route 9 & Connecticut River. Contractor: Middlesex Corporation
Location: Middletown & Portland, CT Design Engineering Company: STV, Inc.
Install Date: 2012 Bridge Owner: Connecticut Department of Transportation
Project Description: Approximately 55,000 square feet of cast-in-place full depth grid reinforced concrete deck panels.
Notable Features of Project: Half-width closures (3 stages) with two of the four lanes open to traffic throughout the duration of the project.
bottom of page